Calculate and diagnose Overall Equipment Effectiveness (OEE) by decomposing into Availability, Performance, and Quality rates. Use this skill when the user needs to measure production line efficiency, identify equipment losses, benchmark manufacturing performance, or justify capital investment — even if they say 'why is our output low', 'machine utilization report', 'production efficiency', or 'how much capacity are we losing'.
IRON LAW: OEE = Availability × Performance × Quality
OEE is a MULTIPLICATIVE metric. 90% × 90% × 90% = 72.9%, not 90%.
Each factor compounds the loss. World-class OEE is 85%+. Most plants
operate at 60-65%. Knowing the TOTAL is useless — you must decompose
to find which factor is dragging performance down.
The Three Factors
Factor
Formula
Measures
Loss Categories
Availability
Run Time / Planned Production Time
Uptime vs downtime
Equipment failures, changeovers, material shortages
Performance
(Ideal Cycle Time × Total Count) / Run Time
Actual speed vs design speed
Minor stops, slow running, idling
Quality
Good Count / Total Count
Yield, first-pass quality
Defects, rework, scrap, startup rejects
Six Big Losses (mapped to OEE factors)
Loss
OEE Factor
Example
1. Equipment failure
Availability
Machine breakdown, unplanned repair
2. Setup & changeover
Availability
Product changeover, die change, cleaning
3. Idling & minor stops
Performance
Sensor blockage, jam clearing, small adjustments
4. Reduced speed
Performance
Running below rated speed due to wear or material
5. Process defects
Quality
In-process rejects, rework
6. Startup rejects
Quality
Scrap during warm-up, first-article failures
Calculation Example
Planned Production Time: 480 min (8-hour shift)
Downtime (breakdowns + changeover): 60 min
Run Time: 420 min
Ideal Cycle Time: 1 min/unit
Total Units Produced: 380
Good Units: 360
Defective Units: 20
Availability = 420 / 480 = 87.5%
Performance = (1 × 380) / 420 = 90.5%
Quality = 360 / 380 = 94.7%
OEE = 87.5% × 90.5% × 94.7% = 75.0%
Diagnosis Steps
Phase 1: Calculate OEE for each production line/machine
Phase 2: Identify the weakest factor (Availability, Performance, or Quality)
Phase 3: Pareto the losses within that factor (which specific loss is biggest?)
Phase 4: Root cause analysis on the top loss (5 Whys, fishbone)
Phase 5: Improve and remeasure
Benchmarks
OEE Level
Rating
Typical
> 85%
World-class
Top manufacturers
60-85%
Typical
Room for improvement
40-60%
Low
Significant losses, urgent action needed
< 40%
Critical
Equipment or process fundamentally broken
Output Format
# OEE Report: {Production Line}
OEE Summary
Factor
Value
Benchmark
Status
Availability
{%}
>90%
🟢/🟡/🔴
Performance
{%}
>95%
🟢/🟡/🔴
Quality
{%}
>99%
🟢/🟡/🔴
OEE
{%}
>85%
🟢/🟡/🔴
Loss Breakdown
Loss
Minutes Lost
% of Total Loss
Priority
{loss type}
{min}
{%}
1/2/3
Root Cause (Top Loss)
{5 Whys or fishbone analysis}
Improvement Plan
Action
Target Impact
Timeline
Owner
{action}
+{X%} OEE
{weeks}
{who}
Gotchas
OEE is per machine, not per plant: Plant-level OEE averages hide that one machine at 95% and another at 45% average to 70%. Analyze individually.
Planned downtime is excluded: OEE measures losses against PLANNED production time. Scheduled maintenance, no-production shifts, and planned shutdowns are excluded from the denominator.
100% OEE is not the goal: It would mean zero changeovers, zero defects, running at max speed 100% of the time. Pursuing 100% can increase costs (e.g., never doing preventive maintenance). Target 85%+ for critical lines.
Data collection is the real challenge: Manual OEE tracking is inaccurate. Invest in automated data collection (sensors, MES integration) for reliable measurement.
References
For TPM (Total Productive Maintenance) methodology, see references/tpm.md
For automated OEE data collection, see references/oee-automation.md