Design production plans using MPS (Master Production Schedule), MRP (Material Requirements Planning), and capacity planning. Use this skill when the user needs to schedule production, plan material procurement, balance capacity with demand, or optimize production sequencing — even if they say 'we can't keep up with orders', 'when should we order materials', 'production scheduling', or 'how do we plan for next quarter's demand'.
IRON LAW: Plan Hierarchically — Demand → MPS → MRP → Shop Floor
Production planning flows TOP-DOWN:
1. Demand forecast / customer orders → what to make, when
2. MPS → master schedule for finished goods
3. MRP → material and component requirements (what to buy, when)
4. Shop floor scheduling → which machine, which sequence
Skipping levels (going from demand forecast directly to shop floor)
creates chaos — material shortages, capacity conflicts, missed deliveries.
Logic: For each week, calculate: Production Needed = Demand - Beginning Inventory - Scheduled Receipts + Safety Stock
Output: Planned production quantities by week for each finished product
Constraint: Must not exceed available capacity (rough-cut capacity planning check)
MRP Process
Inputs: MPS (what to make) + BOM (Bill of Materials — what it's made of) + Inventory status + Lead times
Logic: "Explode" the BOM — for each finished good, calculate when each component/material must be ordered to arrive in time
Output: Planned purchase orders and production orders with dates and quantities
Key calculation: Order date = Need date - Lead time
Scheduling Algorithms
Algorithm
Rule
Best When
FCFS (First Come First Served)
Process in order received
Low complexity, fairness matters
SPT (Shortest Processing Time)
Shortest job first
Minimize average flow time
EDD (Earliest Due Date)
Most urgent due date first
Minimize late deliveries
Bottleneck-first
Schedule the constraint first, subordinate rest
Capacity-constrained environments (TOC logic)
SMED (Single-Minute Exchange of Die)
Reduce changeover time to increase flexibility:
Separate internal setup (machine stopped) from external (can do while running)
Convert internal to external where possible
Streamline remaining internal steps
Practice and standardize
Output Format
# Production Plan: {Product/Period}
Demand vs Capacity
Week
Demand
Available Capacity
Gap
W1
{units}
{units}
{+/-}
Master Production Schedule
Week
Product A
Product B
Product C
Total
W1
{units}
{units}
{units}
{units}
Material Requirements
Material
Quantity
Order Date
Supplier
Lead Time
{material}
{qty}
{date}
{supplier}
{days}
Scheduling
Work Center
Mon
Tue
Wed
Thu
Fri
{center}
{job}
{job}
...
...
...
Gotchas
Forecast accuracy limits everything: MPS/MRP is only as good as the demand forecast. Track forecast accuracy (MAPE) and build safety stock proportional to forecast error.
Lead time variability kills plans: If supplier lead time is "2-6 weeks" (4 week variability), you need safety stock for the worst case. Reduce variability through supplier management.
BOM accuracy is critical for MRP: A wrong BOM means ordering wrong materials. Audit BOMs quarterly.
Frozen zone: The first 1-2 weeks of MPS should be "frozen" (no changes) to allow stable execution. Changes inside the frozen zone cascade chaos through the system.
Finite vs infinite capacity: Basic MRP assumes infinite capacity (ignores machine constraints). Always layer a capacity check (rough-cut or detailed) on top of MRP output.